GT-TUG20 JapaneseEnglish
BUILDING Index
  • INDEX
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Design meeting
    1. Design meeting
    Meeting at the builder
    2. Meeting at the builder
    The first hull is off the mould
    3. The first hull is off the mould
    Stern-deck is finished
    4. Stern-deck is finished
    Loaded out
    5. Loaded out
    Official inspections before launching
    6. Official inspections before launching
    Test run
    7. Test run
    Exterior
    8. Exterior
    Iinterior
    9.
    Iinterior
    Run
    10. Run
       
     
      next
     
    ページの上へ移動
    Copyright(C) 2007 Tadami.com. All rights reserved.